Project Process

  1. INITIAL INQUIRY & PROJECT EVALUATION (Payment Not Required)
    After contacting Niagara North Group for the first time, our team evaluates your project and returns your call or email within four business days. As fit is important to us, we will provide you with a project checklist for you to fill out to the best of your abilities. Due to overwhelming demand, Niagara North Group cannot accommodate every request we receive. We carefully assess every enquiry and advise if our company can take on your project or if we may have to decline due to scope, budget or location.
     

  2. VISIT & MEETING (Payment Not Required)
    If we are a good fit, a meeting is scheduled to visit showroom at our materials supplier to discuss your goals and budget. Design fees typically amount to 3–5% of the total project cost (excluding engineering). Your project's design fee is calculated during this meeting. A free approximate estimate will be provided at this time.
     

  3. DESIGN PHASE (Payment Required)
    Once a design contract has been signed, the design phase begins:
    - Site Survey & Base Plan
    - Property Research (by-laws, zoning, lot coverage, offsets, conservation etc.)
    - Engineering (if required)
    - Wish List Meeting (if required)
    - Concept Presentation
    - Materials Estimate (from our selected suppliers)
    - Scope of Work & Final Installation Estimate
     

  4. CONTRACT & DEPOSIT (Payment Required)
    Upon deciding to proceed, we commence the process to formalize contracts, gather signatures and obtain a deposit.
     

  5. PERMIT PROCESS & WORKING DRAWINGS (Payment Required)
    Niagara North believes in doing things right. If a permit for your job is needed, ordinarily we will initiate the permit application on your behalf. Permit drawings will need to be made, and all construction details worked out.
     

  6. INTRODUCTION & PRE-CONSTRUCTION MEETING (Payment Not Required)
    A meeting is arranged with you and your project manager to review our plan to complete your project in the most efficient way possible.
     

  7. CONSTRUCTION BEGINS (Payment Required)
    We take care of all the details during development and keep you informed on a need-to-know basis. Be prepared that there are always surprises and site unknowns.

Warranty

  1. A one-year (1) one-time replacement warranty exists for all plant material supplied and installed by Niagara North Group with appropriate irrigation system. It is the owner's/client's sole responsibility to ensure adequate watering and maintenance of all plant material after installation, and during the warranty period. While every effort is made to locate suppliers for the plants listed above, it should be noted that specific plant selections, numbers, and sizes mentioned above are subject to substitution without notice should stock become unavailable, in which case the most suitable substitution will be made by a Niagara North Group representative. Some trees can take time to establish and Niagara North Group reserves the right to postpone replacement until it is certain the tree will not survive.
     

  2. A two (2) year warranty exists on all craftsmanship performed by Niagara North Group provided that proper maintenance procedures are practiced. Project materials are subject to individual manufacturer warranties and are not the responsibility of Niagara North Group.
     

  3. Niagara North Group is not responsible for any damages from natural material changes such as staining discolouring, efflorescence, cracking, chipping, changes in shape that may occur on wood, poured-in-place concrete, precast concrete, asphalt, natural stone, concrete pavers or brick after installation. Pressure treated lumber is a popular material choice for outdoor construction but is prone to cracking and twisting caused by the elements and cannot be warrantied. Niagara North Group is also not responsible for damages caused by de-icing salts or any other products applied to natural stone or concrete products.
     

  4. Owner/client agrees to allow Niagara North Group to photograph the project site at times, before, during, and after the completion of the project for purposes of documentation and promotion.
     

  5. Although Niagara North Group will undertake to avoid all unnecessary delays with respect to landscape construction, the owner/client hereby acknowledges that Niagara North Group is not responsible for circumstances beyond our control including adverse weather, availability or late delivery of materials, strikes, or failure of other subcontractors of the owner/client to complete other necessary prerequisite work prior to project start.
     

  6. Niagara North Group is not responsible for any and all unforeseen costs that may occur during the landscape construction process. This includes (but is not limited to) excavation of hidden rocks, tree trunks, foundations, wells, septic tanks and fields or vandalism. These items will be considered extras to the contract and will be brought to the owners/clients attention immediately.
     

  7. Niagara North Group is responsible for contacting all local public utility companies with respect to (Telephone, Cable, Gas, Hydro, Etc.) Any property line demarcation (through registered survey plan or companies) and private utilities including septic and well systems shall be the sole responsibility of the owner/client to identify. Niagara North Group is not responsible for any claims for damages caused to private utilities and work relating to property line locations.
     

  8. The owner/client acknowledges that there may be a slight variation in color between the color samples shown and the actual color of the material installed due to manufacturing times or natural processes. If the contracted material pattern, color, or sizing changes at the request of client and requires re-ordering or return of material, there will be a restocking charge equal to 30% of the material value.
     

  9. Niagara North Group is not responsible for damage to existing automatic irrigation systems or lighting systems. Any alterations or upgrades required to accommodate new landscape installation is the responsibility of the owner/client unless contracted in scope of work through Niagara North Group for completion.
     

  10. Niagara North Group carries insurance for public liability and property damage along with coverage for all employees through the Workers Compensation Insurance Board.
     

  11. Niagara North Group shall be entitled to compensation for services performed and material purchased up to point of notification if owner/client chooses to terminate contract or abandon project at any state of completion over the duration of contracted work.
     

  12. It is the owner's/client’s sole responsibility to obtain all necessary work permits with proper documentation required with respect to landscape construction at their own expense prior to the commencement of any work. If Niagara North Group is contracted to provide working drawings or consult for any required permit documentation, the time will be billed at an hourly rate of $125.00 per hour plus the actual municipal permit fee. It is the owner/client’s sole responsibility to provide any/all permit fees and/or deposits prior to the permit being submitted. Deposit cheques are to be payable to the applicable municipality.
     

  13. All electrical work (120v ands higher) will need to be performed by a licenced electrician and an electrical inspection from the Electrical Safety Authority. All gas work to be performed by licenced gas fitter/technician.
     

  14. Any minor cracking from shifting or settlement for poured-in-place plain, patterned, or exposed aggregate reinforced concrete is not warrantied. A differential shifting of plus or minus one inch in one direction from the true line is common. Any touch-ups or repairs are considered a service item and billable. Patterned and exposed aggregate concrete require re-sealing within a two-year period, which is not warrantied (but recommended) and is considered normal maintenance to protect the integrity of surface treatment.

  15. Niagara North Group will take the necessary precautions to protect existing trees from damage during construction but will not be responsible for any damages or defects to existing trees that appear after the project is completed.
     

  16. Niagara North Group will make every attempt to ensure proper drainage of patios, walkways and lawns but due to strict city/town by-laws, only minor grade changes are allowed. Niagara North Group is not responsible for damage caused by existing drainage problems. According to by-laws, downspouts should not be connected to underground drainage pipes and, if installed as per the client's request, Niagara North Group is not responsible for any damages caused by underground drainage pipes backing up due to excessive rain, freezing (or excess water in perimeter planting areas where this water may be redirected).
     

  17. Warranty work will not be completed until all contract payments are paid in full.
     

  18. Any deviation from the payment plan could result in Niagara North Group halting the work until payments are up to date.
     

  19. Client is responsible for maintaining a watering schedule for newly installed sod and grass seed. Niagara North Group does not replace or warranty sod or grass seeding.